I first met the river when I drove over it on the bridge into Şile, then when I began to live just 50 meters away from the river banks she and I became more intimately connected.
Every day the river would gift me something, most often the sight of her visitors and her inhabitants. I lack a good camera and skills so the photos here do not do justice to the beauty.
This page is all about the river that flows from Yeniköy to Şile
Yeniköy Deresi. The river before it was fully dredged and paved with concrete
"people walk or drive over the bridge without slowing to see what a miracle of life is just below them"
its easy to complain, but what about a solution?
"how will you protect people from floods?" is the question the chief of the water authority asked me during our meeting.
the below project, i call it Şile oasis, was my reply.
If you would like to be involved in work to protect your river or to restore a wetland near you, let's talk. There is strength in numbers!
The river has been concreted over. The following photos show some of the floods, surrounding flooded areas, the red stained river after inland mining activities discharge their silt into the river (adding to the flood risk), and the situation as is now. (September 2024)
We designed a solution that would work towards alleviating many of the flood plain problems while preserving and restoring the ecosystem and also providing socio-economic benefit to the local people.
The authorities were unable to act upon this plan despite their own insistence that such a plan was the "only true solution". The reason that they gave us for this inability was "political difficulty".
We believe that this project or elements of it can be adapted to be useful for other rivers and wetland areas. If you would like more information and details contact me.